PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Copper piping at the 2nd floor bathroom sinks Facing South.jpg Ductwork raiser at the 3rd floor Facing South-East.jpg Installed copper piping at the 3rd floor bathroom Facing North.jpg Installed copper piping at the 3rd floor Facing West.jpg Installed metal decking at Stair -3 4th Floor Facing North.jpg Weather strips at the curtain wall South elevation.jpg Erecting stone panels at the North Elevation.jpg
Previous pageNext page Installed metal decking at Stair -3 4th Floor Facing North
Installed metal decking at Stair -3 4th Floor Facing North